Pipelines
Moomba–Adelaide Gas Pipeline — fitness-for-service
Fitness-for-service assessment of the 781 km Moomba–Adelaide Gas Pipeline from the 2024 in-line inspection program — corrosion-growth modelling and a 15-year repair forecast to 2040.
ILI data turned into auditable engineering decisions.
IICORR Cloud — an advanced pipeline integrity and Fitness-for-Service (FFS) platform that transforms in-line inspection data into actionable, standards-based engineering decisions.
Overview
At IICORR Cloud (iicorrcloud.com) we deliver an advanced pipeline integrity and Fitness-for-Service platform designed to transform in-line inspection data into actionable engineering decisions. The cloud-based solution integrates intelligent ILI data processing, automated defect matching, corrosion-growth prediction and standards-based FFS assessment in a single, user-friendly environment.
Supporting ASME B31G, Modified B31G and RSTRENG, the platform lets pipeline operators and integrity engineers assess defect severity, predict remaining life, optimise maintenance planning and proactively manage asset integrity with traceable, auditable, data-driven confidence. The same engineering underpins our structural assessment work across pipelines, plant and civil structures.
Capabilities
Automated processing of in-line inspection datasets — compatible with ROSEN, TD Williamson, Baker Hughes and 3P Services.
Run-to-run defect matching and clustering to track features across successive inspections.
Corrosion-growth-rate modelling feeding remaining-life and repair forecasting.
Fitness-for-Service to ASME B31G, Modified B31G and RSTRENG (and API 579 where required).
Analytical and numerical structural assessment for pipelines, plant and civil structures.
Applications
Standards
Outcomes
The platform
Intelligent ILI data processing, automated defect matching, corrosion-growth prediction and standards-based fitness-for-service — in one auditable environment.

Evidence
Pipelines
Fitness-for-service assessment of the 781 km Moomba–Adelaide Gas Pipeline from the 2024 in-line inspection program — corrosion-growth modelling and a 15-year repair forecast to 2040.
Pipelines
Integrity assessment of a 12-inch gas pipeline — dent strain, corrosion growth, defect clustering and dent–corrosion interaction analysis.
Oil & Gas
Finite-element-modelled impressed-current cathodic protection design and installation for two storage tanks at a defence site, using factory-assembled concentric-ring anodes.
Bring us the asset and the problem
Tailored engineering solutions for your specific project — onshore, offshore, and everything in between.
